Work we have delivered. Named.
Each entry says what the client needed, what we built and what changed. Where we publish a blueprint instead of a delivered project it says so on the card, and it carries no client and no result.
Retail · Catalogue · Gulnaz Car Accessories · 2026
Car accessories catalogue with WhatsApp ordering
A car-accessories shop in Mohali taking orders through Instagram DMs and phone calls, with no catalogue a customer could browse or share.
- Order flow
- WordPress
- Platform
- Pan-India
- Delivery
- gulnazcaraccessries.com
- Site
Retail · Catalogue · Gulnaz Boot Bazaar · 2026
Boot catalogue with WhatsApp checkout
A leather and safety boot retailer in Kharar wanted the range online, but every sale needs stock and size confirmed by the shop before money moves.
- Order flow
- WordPress
- Platform
- 3
- Ranges
- gulnazbootbazaar.com
- Site
Retail · Jewellery · Perfect Diamonds · 2026
Diamond and gold jewellery showroom site
A Chandigarh jeweller needed the showroom online: diamond and 22KT gold collections, certification, coin stock, and a phone number a customer can tap.
- WordPress
- Platform
- 4 → 1 canonical
- Domains
- Diamond + gold
- Collections
- perfectjewellers.com
- Site
Ecommerce · Maysan Shop (our own product) · 2026
Storefront we build and run ourselves
We needed a storefront we could sell and run, not only build: stock, orders, payments and customers in one place.
- Maysan Shop
- Own product
- UPI + cards
- Checkout
- Multi-warehouse
- Stock
- Next.js
- Stack
ERP & Operations · Reference build · 2026
Modular retail ERP — our reference build
Stock that lives in spreadsheets and phone calls: every store counts its own shelf, procurement runs on email, and nobody sees regional stock without a week of reconciliation.
Read the case studyFintech Infrastructure · Reference build · 2026
Fintech connectivity bridge — our reference build
Trading and wealth platforms sitting behind bank APIs that are slow, inconsistent between providers, and prone to timing out at the hour they matter most.
Read the case studyIndustrial IoT · Reference build · 2026
Manufacturing intelligence — our reference build
Production metrics on paper: downtime noticed after the fact, no line-level view of output, and maintenance on a fixed schedule instead of on condition.
Read the case studyHave a similar problem?
Tell us what you need and we will reply with a plan and a price.