Manufacturing intelligence — our reference build

“Production metrics on paper: downtime noticed after the fact, no line-level view of output, and maintenance on a fixed schedule instead of on condition.”

The Challenge

Production metrics on paper: downtime noticed after the fact, no line-level view of output, and maintenance on a fixed schedule instead of on condition.

Technical Implementation

Machine data over MQTT into a stream processor, overall equipment effectiveness calculated per line, and maintenance alerts raised from condition thresholds the plant sets.

Project Timeline

1

Sensor audit

2–3 weeks

Walk the plant, list the machines that can report, and the signals worth collecting.

2

Data pipeline

4–5 weeks

MQTT broker and stream processing, with replay when a gateway drops off.

3

OEE and alerts

3–4 weeks

Effectiveness calculated per line, and thresholds the plant sets for an alert.

4

Dashboards

3 weeks

One page per role — plant, supervisor, operator — from the same data.

5

Rollout

3 weeks

One plant first, then the rest, with maintenance switched over line by line.

Results in Detail

How we measure this class of build: unplanned downtime hours, OEE per line before and after, and the alerts that were acted on versus the ones that were noise. The baseline comes from the plant's own logs, agreed before the pipeline goes in.

Operational Impact

  • Line-level output and downtime, live.
  • Overall equipment effectiveness per machine, shift and plant.
  • Condition-based maintenance alerts instead of fixed schedules.
  • Plant, supervisor and operator views from the same data.