← All services
GST billing and invoicing

GST billing that survives a real return cycle

Most billing software works until the first return cycle. Then accounts spends three days matching purchases against GSTR-2B, finds eleven where the supplier filed a different number, and cannot tell whether each is a typo or a credit never issued.

We build the layer underneath that work: invoices generated from the order instead of typed twice, e-invoices registered before goods leave, e-way bills carried through to delivery, and a reconciliation queue that names the invoices your accountant has to chase. Next.js and PostgreSQL, on your domain.

What has to be right

Six fields, most of the arguments

None of these is hard alone. They are hard together, per line, per state, per year.

GSTIN and registration state

The tax treatment follows the state code on the registration that issues the document, not the address on the letterhead. Two registrations mean two entities, two series, and a customer who is intra-state for one branch and not the other.

HSN or SAC

Four digits up to ₹5 crore turnover, six digits above it, SAC for services. A wrong code is not a display bug: it changes the rate and the GSTR-1 summary, which is how a notice starts.

Place of supply

For goods, where movement ends. For services, the recipient registered address, with separate rules for property, events and transport. Bill-to and ship-to in different states is where IGST gets charged by mistake.

Tax split and rounding

CGST and SGST intra-state, IGST inter-state, each half at exactly half the rate. Rounding to the nearest rupee happens at invoice level, and the rounded figure is what posts to the ledger.

Invoice series

Unique consecutive serials per registration, per financial year, sixteen characters. Gaps, reused numbers and series that restart after a migration are the first questions in an audit.

Credit notes

A credit note reduces output tax only if reported by the deadline, and it has to point at the invoice it corrects. The original stays, and the correction lands in the amendment tables.

What we build

Four systems that have to agree

Invoice generated from the order, not typed again

One document path: order, dispatch, invoice, built from the lines the warehouse picked. HSN or SAC, place of supply, rate and tax split sit on each line. Bill of supply for exempt supplies, delivery challan for job work, reverse charge flagged on purchases, and no serial consumed until the transaction commits.

IRN and e-way bill wired to the portals

Above ₹5 crore turnover, B2B and export invoices and credit notes register with the IRP at issue, and the signed QR is embedded in the PDF the buyer receives. Cancellation works only inside the 24-hour window, so a wrong invoice is fixed immediately. The e-way bill takes Part A from that data, Part B is updated at handover, and validity is one day per 200 km.

WhatsApp delivery and reminders that get read

The PDF goes out on WhatsApp at issue, with the IRN and a payment link, and delivery status is written back to the invoice. Reminders run against the due date instead of someone remembering: three days before, on the date, then a firmer note that copies the salesperson.

GSTR-2B matched against the purchase register

The 2B generated on the 14th is a snapshot of what suppliers filed, not what you owe. We match supplier GSTIN, invoice number, date, taxable value and tax with a rounding tolerance, and queue the rest: not filed, value mismatch, reverse charge, blocked credit, missing credit note. The 180-day payment rule is tracked per invoice.

How a project runs

Five stages, one of them is boring

01

Read what you issue today

We take the last hundred invoices and three return cycles: series, place-of-supply logic, product-to-HSN mapping, freight and discount treatment, and every sheet kept outside the system.

02

Fix numbering and the data model

Series per registration, rate table with effective dates, credit note linkage, audit trail, retention. Expensive to change later, so it is decided in week two and signed off in writing.

03

Build against the portals

Sandbox credentials, then live. Every portal call is idempotent, logged with a request id and retried. The PDF is rendered from a stored payload, so it can be reproduced years later.

04

Run parallel for one return cycle

For a full month the new system and your current process issue the same invoices. We compare the GSTR-1 draft and the 2B match line by line, and go live when they agree or every difference has a name.

05

Handover and the first live filing

Private repository handover, a runbook for portal outages, alerts on IRN and e-way failure rates, a session with the accounts team, and we sit through the first filing with you.

What it costs

Priced before the build, not after

A GST billing build starts at ₹2,00,000, after a paid discovery of ₹25,000 to ₹50,000. The discovery is where we read your invoices and returns and write the field map, and it is yours whether or not you build with us. The quote at the end of it is fixed.

If you also need a site or enquiry flow in front of the billing system, the Starter packages cover that, with hosting and backups included.

See full pricing

GST billing build

from ₹2,00,000

Web apps, mobile apps and portals built to your spec, with private repository handover.

Paid discovery

₹25,000 to ₹50,000

Field map, scope and a fixed build quote. Yours to keep either way.

Starter

₹25,000 + ₹2,000/mo

Get your business online properly.

Starter Plus

₹45,000 + ₹3,500/mo

Turn visitors into enquiries you can track.

Starter + AI

₹70,000 + ₹11,000/mo

Every enquiry answered in under a minute.

All prices in INR. The quote is fixed before the build starts.

In every build

The parts that decide whether it holds

None of these show up in a demo. All of them show up in a bad month.

  • A rate and HSN table versioned by effective date, so a rate change is data, not a deploy
  • Idempotent portal calls: a retried IRN returns the original number, never a second invoice
  • Invoice PDFs kept with a hash and the payload they came from, for the six years the law asks
  • Audit trail on every edit, cancellation and credit note, with who did it and what changed
  • An exception queue with an owner and a due date, not a mismatch report nobody opens
  • CSV export of invoices, credit notes and return drafts, so leaving is a download
Questions we get asked

Before you send a brief

Do we have to be above the e-invoicing threshold?

E-invoicing applies to B2B and export invoices and credit notes once turnover crosses ₹5 crore in a financial year; B2C stays out. Below that line you still need a compliant invoice, the right place of supply and a return that agrees with the books. Either version runs on the same data model, so crossing the threshold is configuration.

Can you keep our accountant in step instead of replacing the process?

We replace the double entry and the manual matching. The accountant still reviews the GSTR-1 draft, decides which credits to claim and signs the return. Each period you get three buckets, matched, supplier not filed, and value or tax mismatch, plus a CSV export.

What happens when the IRP or the e-way bill portal is down?

Dispatch does not stop. The invoice commits with its number and PDF, the IRN request enters a durable queue and retries with the same key, so one invoice cannot produce two IRNs. Goods are stricter: a B2B consignment above ₹50,000 needs a valid e-way bill, so dispatch is blocked rather than the truck leaving.

How long does a billing build take?

Six to ten weeks for one registration, plus a full return cycle of parallel running. Each extra GSTIN adds about two weeks, mostly in testing. Discovery comes first: the rules in your last hundred invoices decide the size of the build.

What about the invoices we already issued?

They are imported with original numbers, dates and tax splits, marked historical and kept out of new series. A credit note after go-live links back to the imported invoice, so the amendment lands in the right GSTR-1 table. A series that restarts at one is the first thing an officer asks about.

Send three invoices and one 2B

That is enough to show where your mismatches come from. You get a field map, a scope and a fixed price, usually within two working days.

Start your project